03.10.2016
09.10.2015
05.10.2015
05.09.2015
30.07.2015
25.05.2015

 

The main idea of this project is to decorate the hall by the brickwork of a new walls and the Venetian terrazzo flooring.  (More images…)

26.11.2014

Here are some pictures of the building process of the house. (More pictures…)

29.04.2014

 

This is the last conceptual design which is now very close to be realized.  Developing an idea to organize a kind of courtyard by adding of two perpendicular facades with frontons, we also broke undesirable continuity of the long facades, turning the chaotic situation on site to its advantage. The new volume of the concert hall is settled between two existing buildings and enclosed into the colored brick walls.  (More pictures…)

03.03.2014

30.01.2014

 

The second edition of the project(View more…)

Previouspage 1 / 3Next